![]() ![]() ![]() ![]() An Engineering Bill of Material from Engineering Data Management module may also be copied to make a production BOM. An existing BOM can be easily modified to create a newer version of BOM. Thereafter, components are added at each level. Levels of BOM are defined indicating material-routing relationship at every level of operation. ![]() Defining a production bill of materials: The end item is described at highest level of BOM.In a multi level BOM, a parent/child relationship between successive levels is formed.īOM is used both for production and planning purpose, as specified below: BOM details components required at various phases or levels of operations (either single level or multi level). Method or route to be followed for manufacturing a product is a prerequisite for setting up production module.īill of Materials: Any manufacturing process goes through various phases of production and at each phase, components (either work in progress or purchased) are needed. Routing is another important base of production module, which defines the method of manufacturing. The main use of BOM is to define product structure of a manufactured end item. A manufactured item consists of components, which are used to build the product through production operation(s). Bill of Material (BOM) is a base functionality of setting up production module of an ERP system. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |